Discover unmatched choice at Westgate Chrysler Jeep Dodge Ram in Raleigh, home to a huge lineup of new vehicles and one of the largest used-car inventories on the east coast with 1,000+ options ready to drive.
- Push Button Start
- Remote Keyless Entry
- Chrome Grille w/Flat Black Grille Insert Bars
- 2 Charge/Data USB Ports
- Apple CarPlay/Android Auto
- OnStar & GMC Connected Services Capable
- Wireless Phone Projection
- Solar Absorbing Tinted Glass
This 2024 GMC Sierra 2500HD Pro is a powerful and capable pickup that's ready to take on any job or adventure. With its robust 6.6L V8 engine and 10-speed automatic transmission, this Sierra 2500HD delivers impressive performance and towing capacity, making it the ideal choice for those who demand the best in strength and versatility.
Beyond its impressive powertrain, this Sierra 2500HD Pro is packed with a wealth of premium features that elevate the driving experience. Enjoy the convenience of push-button start, remote keyless entry, and wireless phone projection, as well as the added safety and security of features like forward collision alert and automatic emergency braking.
The exterior of this Sierra 2500HD Pro exudes a bold and confident presence, thanks to its striking chrome grille and flat black grille insert bars. Meanwhile, the solar-absorbing tinted glass helps keep the cabin cool and comfortable, even on the hottest days.
Inside, you'll find a spacious and well-appointed interior, with comfortable seating, ample storage, and a host of advanced technology features. The 6-speaker audio system and GMC Infotainment System provide excellent entertainment and connectivity, while the included Suspension Package ensures a smooth and stable ride, even when the going gets tough.
Whether you're tackling demanding work projects or embarking on epic adventures, this 2024 GMC Sierra 2500HD Pro is the perfect companion. Experience the ultimate in power, capability, and refinement – visit Westgate Chrysler Jeep Dodge Ram in Raleigh today and discover the difference for yourself.
Choose Westgate Chrysler Jeep Dodge Ram in Raleigh, NC for a dealership experience built on transparency, value, and customer-first service. With a wide selection of new CJDR models and an extensive inventory of quality used cars, trucks, and SUVs, Westgate is a trusted destination for shoppers across Raleigh, Durham, the Triangle and all of North Carolina.
Every vehicle at Westgate comes pre-installed with Recovr vehicle location technology and professional window tint, included for a total cost of $799.